View larger image of Thermafold 2000 Top Hung Insulated Folding Doors from Bolton Gate Co LtdThermafold 2000 Top Hung Insulated Folding Doors

For larger openings or exposed locations where its robust construction makes it particularly tolerant of high wind conditions. Flush face design with energy saving benefits of an insulated construction.Door panels:Constructed from hollow steel sections with 1.5 mm thick flat galvanized steel facing sheets on both sides. The panels are infilled with a high-density insulation material and have an overall thickness of 63 mm.Tracks:The door panels are top-hung on 4 wheel trolley bearing hangers which incorporate the panel hinges and run in a galvanized steel top track. An auxiliary top track is attached to allow the panels to fold correctly. Brass rollers connected to the bottom hinges run in a steel channel bottom track, which is set for alignment within a 200 x 100 mm chase before final grouting into position.Door arrangements:The doors are normally face fixed to the inside of the opening but can be arranged to mount directly between jambs. They can be supplied as a single door (bunching to one side) or bi-parting.Weight: Approximately 45 kg/m².Thermal transmission: The door panels provide a U-value of 0.47 W/m²°C.Operation: 415V, 3 phase motor.Optional items:A variety of controls.Cut-outs for runway beams.Double-glazed vision panels.Safety photocells.Single phase electric operation.Wicket doors with cylinder lock.Product literature:http://www.ribaproductselector.com/documentdetails.aspx?ci=00979&f=COL139178.pdf&pg=

For larger openings or exposed locations where its robust construction makes it particularly tolerant of high wind conditions. Flush face design with energy saving benefits of an insulated construction.

Door panels:

Constructed from hollow steel sections with 1.5 mm thick flat galvanized steel facing sheets on both sides. The panels are infilled with a high-density insulation material and have an overall thickness of 63 mm.

Tracks:

The door panels are top-hung on 4 wheel trolley bearing hangers which incorporate the panel hinges and run in a galvanized steel top track. An auxiliary top track is attached to allow the panels to fold correctly. Brass rollers connected to the bottom hinges run in a steel channel bottom track, which is set for alignment within a 200 x 100 mm chase before final grouting into position.

Door arrangements:

The doors are normally face fixed to the inside of the opening but can be arranged to mount directly between jambs. They can be supplied as a single door (bunching to one side) or bi-parting.

More about Thermafold 2000 Top Hung Insulated Folding Doors:
As standard - Options

Thermafold 2000 Top Hung Insulated Folding Doors
 Manufacturer:
Bolton Gate Co Ltd.
  -Web:www.boltongate.co.uk.
  -Tel:+44 (0)1204 871001.
  -Product reference:
Thermafold 2000 Top Hung Insulated Folding Doors.
 Size:
[12 x 8 m (Single)].
[24 x 8 m (Double)].
 Finish:
[HP200 Colorcoat Plasticol].
[Polyester powder coated].
[Standard galvanized finish].
 Optional items:
[Cut-outs for runway beams].
[Double-glazed vision panels].
[Safety photocells].
[Single phase electric operation].
[Wicket doors with cylinder lock].


top ^

Guidance

for Thermafold 2000 Top Hung Insulated Folding Doors

from Bolton Gate Co Ltd

More about Thermafold 2000 Top Hung Insulated Folding Doors: As standard - Options

As standard

Weight:

Approximately 45 kg/m².

Thermal transmission:

The door panels provide a U-value of 0.47 W/m²°C.

Operation:

415V, 3 phase motor.

Options

Optional items:

  • A variety of controls.
  • Cut-outs for runway beams.
  • Double-glazed vision panels.
  • Safety photocells.
  • Single phase electric operation.
  • Wicket doors with cylinder lock.

Further Information

Literature:


RIBA Product Selector

Additional information may be available for Bolton Gate Co Ltd from ribaproductselector.com.

Contacts:

www.boltongate.co.uk

sales@boltongate.co.uk

T: +44 (0)1204 871001

F: +44 (0)1204 871049

Drag work item to add to schedule

top ^

 
NBS Plus
NBS Building, online library, 16 December 2017